loading logo

Project Progress

previous button
next button

AUG

2026

JUL

2026

JUN

2026

MAY

2026

APR

2026

MAR

2026

FEB

2026

JAN

2026

DEC

2025

NOV

2025

OCT

2025

AUG

2025

JUL

2025

JUN

2025

MAY

2025

APR

2025

MAR

2025

JAN

2025

DEC

2024

OCT

2024

SEP

2024

JUL

2024

APR

2024

DEC

2023

AUG

2023

JUL

2022

JUN

2022

MAY

2022

APR

2022

MAR

2022

FEB

2022

JAN

2022

DEC

2021

NOV

2021

OCT

2021

SEP

2021

03.10.2025

Latest updates on the Reinforced Slope Wall

expand icon

The Reinforced Slope Wall at the 18th hole is now complete.
This milestone brings us one step closer to unveiling a truly exceptional finishing hole.

arrow-next

Drag

Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall
Latest updates on the Reinforced Slope Wall

18.08.2025

The construction of a Reinforced Slope Wall

expand icon

The construction of a Reinforced Slope Wall for the golf course, along with the subgrade leveling, is in progress. Aerial view shows the subgrading platform of Hole 1, 9 & 18.

arrow-next

Drag

The construction of a Reinforced Slope Wall
The construction of a Reinforced Slope Wall

15.07.2025

Site preparation for extreme weather

expand icon

To ensure the construction site remains safe and stable, a reinforced slope wall is being built to support the soil and prevent collapses. Additionally, protective measures like coverings—such as tarps or erosion-control blankets—are used to shield the site from extreme weather, such as heavy rain or strong winds. These steps help keep the area secure, prevent damage, and avoid delays, ensuring the project stays on track even in harsh conditions.

arrow-next

Drag

test
Site preparation for extreme weather
Site preparation for extreme weather
Site preparation for extreme weather

01.06.2025

The subgrade level of the golf course is in progress

expand icon

Golf course subgrade leveling is underway. The drainage filter layer (rockfill/geotextile with U-pins) is being installed, with specified materials compacted in 400mm compliant layers.

arrow-next

Drag

The subgrade level of the golf course is in progress
The subgrade level of the golf course is in progress
The subgrade level of the golf course is in progress
The subgrade level of the golf course is in progress
The subgrade level of the golf course is in progress

04.05.2025

Reinforced slope wall in progress

expand icon

With the retaining wall taking shape, levelling work is also being carried out on existing ground, enabling the transfer of select fill materials and drainage filter layer (rockfill) with geotextile and geogrid. The materials will be compacted into layers a maximum of 400mm in depth, using a roller to achieve the required standard.

arrow-next

Drag

Reinforced slope wall in progress
Reinforced slope wall in progress
Reinforced slope wall in progress

28.04.2025

Temporary drainage channels in progress

expand icon

A temporary soil bund and drainage channels allow surface runoff water to percolate through a geotextile filter and meet specific government regulations.

arrow-next

Drag

Temporary drainage channels in progress
Temporary drainage channels in progress
Temporary drainage channels in progress

17.03.2025

Reinforced slope wall in progress

expand icon

Selected materials are being imported. Each layer of rock fill material shall be compacted by at least eight passes of a vibrating roller or by other equivalent compaction method approved by the Engineer.

arrow-next

Drag

Reinforced slope wall in progress
Reinforced slope wall in progress
Reinforced slope wall in progress
Reinforced slope wall in progress

16.01.2025

Phase two site-formation

expand icon

Continue site clearance to prepare for constructing the reinforced slope wall. Simultaneously, advance Phase Two site formation work on +38mPD & +40mPD platforms.

arrow-next

Drag

Phase two site-formation
Phase two site-formation
Phase two site-formation
Phase two site-formation

01.12.2024

Perparation for the construction of reinforced slope wall

expand icon

As part of the major build in phase two of course construction, the reinforced sloped wall, also called a retaining wall, will be developed. Averaging six to eight metres in height, the 1.5km retaining wall improves functionality by expanding the playable area in the project footprint, creating level surfaces, and offsetting uneven terrain and elevation changes.

arrow-next

Drag

Perparation for the construction of reinforced slope wall
Perparation for the construction of reinforced slope wall
Perparation for the construction of reinforced slope wall

01.10.2024

Phase two site-formation begins

expand icon

Phase Two site formation has commenced, with golf course subgrade work in progress. This critical layer ensures long-term stability by compensating for potential landfill settlement while providing the precise slopes needed for drainage. Proper subgrade construction also acts as a protective barrier, preventing landfill gas migration into the turf root zone.

arrow-next

Drag

Phase two site-formation begins
Phase two site-formation begins

01.09.2024

Second Phase of course commences

expand icon

Together with representatives from Plover Cove Golf Club, the appointed construction company - CR Construction Company Limited - and project consultants held a traditional Chinese project commencement ceremony to mark Stage Two of the project's site formation.

arrow-next

Drag

Second Phase of course commences
Second Phase of course commences
Second Phase of course commences

01.07.2024

Completion of Phase One site formation

expand icon

The completed +40mPD platform (40m above Principal Datum) ensures golf course stability by preventing landfill gas migration and differential settlement. It complies with all government safety standards, protecting turf integrity from subsurface contaminants.

arrow-next

Drag

Completion of Phase One site formation

01.04.2024

Stockpilling in progress with protection of gas well

expand icon

Gas well protection on the uppermost platform is now complete, with works progressing as planned.

arrow-next

Drag

Stockpilling in progress with protection of gas well

01.12.2023

Stockpilling in progress with protection of gas well

expand icon

Continue Phase One site preparation works, including material stockpiling and protective measures for the gas well, in full compliance with health and safety regulations and government protocols.

arrow-next

Drag

Stockpilling in progress with protection of gas well

01.08.2023

First batch of soil delivery

expand icon

The first batch of soil, with a volume of 200,000m³, was delivered, marking the beginning of Phase One of the site formation works. This phase aims to level the entire golf course by cutting and filling terrain, providing balanced earthwork distribution, and maximising land usability for optimal course design and drainage efficiency.

arrow-next

Drag

First batch of soil delivery

01.07.2022

Project officially began

expand icon

As Hong Kong's first privately held reclaimed-land championship golf course, Plover Cove is destined to make history while creating an exclusive sanctuary for discerning players.

arrow-next

Drag

Project officially began

Media Enquiries